High Steel Project Highlights 2014/2015 (Tappan Zee, Jim Thorpe, Ohio River Bridge and other projects), and 3D Modelling/Measuring (1 PDH)
Bob Cisneros & Sue Steele will be sharing experiences as bridge engineers with High Steel, focusing on the assembly and erection of larger structures. Topics will include the new SR 903 structure in Jim Thorpe, PA, for which multiple crane lifts were used in order to eliminate shoring tower placements in the challenging terrain while erecting the 335 ft main spans over the Lehigh River and multiple, active rail lines. Also, the use of more advanced 2D and 3D models and measurement methods in the assembly of larger bridge units such as the Ohio River Bridge (a cable stayed structure) will be discussed.
Bob Cisneros, PE, and Susan Steele, PE - High Steel Structures, Inc.
Valley Forge Casino Resort Hotel
1160 First Avenue
King of Prussia, PA 19406
Please RSVP by 9/16/2015. RSVP via online reservations by Clicking Here.
Fees: SEI Members $45; Non-members $50; Students $15
For questions about the event or how to register, contact John Milius at [email protected].
For questions about payment, contact SEI Treasurer Joseph Fazio at 610-290-5126.